CTEL-TM-OTM — Operational Test Management glossary
173 terms the exam expects you to know, defined in plain language.
#
- 4L's(4l's, liked learned lacked longed for)
- A retrospective format focusing on Liked, Learned, Lacked, and Longed for aspects.
- 4L's Retrospective Format(4l's, liked, learned, lacked, longed for, 4l's retrospective format, 4l's format, liked, learned, lacked, and longed for)
- A retrospective format that asks participants to share what they Liked, Learned, Lacked, and Longed For.
- 4L's Retrospective Technique(4l's, 4 l's, liked learned lacked longed for)
- A retrospective method using Liked, Learned, Lacked, Longed for to uncover root causes.
- 5 Whys(5 whys)
- A root cause analysis technique that iteratively asks "why" to uncover underlying issues.
- 5 Whys Retrospective Technique(5 whys, five whys)
- A retrospective method that repeatedly asks 'why' to identify root causes of issues.
- 5 Whys Technique(5 whys, 5 whys technique)
- A root cause analysis method that iteratively asks 'why' to drill down from a symptom to its underlying cause.
A
- Acceptance Criteria(acceptance criteria)
- Explicit conditions in a test service contract that test deliverables must meet to be accepted.
- Acceptance Criteria for Test Deliverables(acceptance criteria)
- Clear criteria in SLAs to define when deliverables are accepted.
- Accountability in Retrospective Actions(accountability)
- The requirement that each action item has a named lead with authority and resources to complete it.
- Action Item Ownership(single owner)
- The practice of assigning a single accountable person for each retrospective action item.
- Action Item Prioritization(prioritization)
- The selection of the top 2-3 most impactful actions from a single retrospective to avoid overloading the team.
- Action Item Tracking System(tracking system)
- A persistent tool, such as a project management system, used to monitor retrospective action items.
- Action Items(action items, action item)
- Specific, measurable improvements with assigned owners and deadlines from a retrospective.
- Action Items Tracking(action items tracking)
- The process of recording, assigning owners and deadlines, and reviewing progress of improvement tasks from retrospectives.
- Action item(action item, action items)
- A concrete task with an owner and deadline resulting from a retrospective.
- Analogy-Based Estimation(analogy)
- An estimation technique that uses historical data from similar projects to estimate resources.
B
- Blame-Free Environment(blame-free environment, blame-free, blame-free retrospective, blame-free culture)
- A principle ensuring retrospectives focus on process improvement, not individual performance.
- Blame-Free Retrospective(blame-free event, blame-free retrospective)
- A retrospective focused on process improvement, not individual performance.
C
- Change Control Process(change control process)
- Formal process for evaluating and approving scope changes to manage impact on schedule, cost, and quality.
- Change management(change management, change management clauses)
- A contractual clause defining procedures for handling changes in scope, requirements, or schedules.
- Cognitive Biases in Risk Identification(cognitive biases)
- Mental biases such as optimism bias and confirmation bias that can lead to overlooking significant risks.
- Communication Plan(communication plan)
- A plan defining what information is shared with stakeholders, how often, and through which channels.
- Communication Protocol(communication protocol)
- Specifications for frequency, format, escalation paths, and tools for collaboration to ensure consistent information sharing.
- Communication platform(common communication platform)
- A common tool or system used for sharing information and status updates between organizations.
- Communication protocols(communication protocols)
- Defined frequency, format, escalation paths, and tools for collaboration in testing engagements.
- Conflict Resolution(conflict resolution)
- Negotiation with project managers and stakeholders to resolve competing demands for resources.
- Conflict Resolution in Resource Management(resource conflicts, conflict resolution)
- The process of resolving resource conflicts through negotiation with project managers and stakeholders.
- Conflict mediation(conflict resolution, conflict mediation)
- The act of resolving disputes by focusing on contract terms and project goals.
- Contingency Planning(contingency plans, contingency planning)
- Proactive identification of resource risks and preparation of backup plans to prevent shortages.
- Continuous Improvement Culture(improvement culture, culture of continuous improvement)
- An organizational culture that values ongoing process enhancements through consistent practice and visible results.
- Continuous Improvement Cycle(improvement cycle, continuous improvement cycle, ongoing cycle of improvement)
- A recurring activity that uses retrospective outcomes as primary input to enhance processes.
- Continuous Risk Monitoring(continuous monitoring, monitor mitigation actions, continuous risk monitoring)
- The ongoing process of tracking risks and adjusting mitigation plans throughout the project lifecycle.
- Contract Amendment
- A formal change to the contract, documented to avoid reliance on verbal agreements.
- Contract review(contracts reviewed by legal and procurement, contract review)
- The process of examining contracts by legal and procurement teams to ensure enforceability and completeness.
- Corrective Actions(corrective actions)
- Provisions in a test service contract to address underperformance or non-compliance.
- Crisis Management(crisis management)
- The process of identifying, assessing, and responding to events that could have a severe negative impact on the project.
- Crisis Response Plan(crisis response plan)
- A plan that identifies potential crisis scenarios, roles, communication channels, and escalation paths.
- Cultural Differences in Communication(cultural differences)
- Variations in communication styles and norms between organizations that can affect collaboration and require proactive management.
- Cultural adaptation in testing communication(cultural and language differences, handling cultural differences)
- Adapting communication styles to address cultural, language, and time zone differences with global third parties.
D
- Dashboard Audience Tailoring(audience tailoring)
- The practice of customizing dashboards (e.g., summaries for executives, drill-downs for test managers) to meet stakeholder needs.
- Dashboard Design Principles(dashboard design principles)
- Key principles for effective dashboards including relevant KPIs, data accuracy, and update frequency.
- Data-Driven Retrospective(data-driven retrospective)
- A retrospective using metrics like defect density, test coverage, or cycle time.
- Delphi Technique(delphi technique)
- A structured method to avoid groupthink by gathering expert input anonymously and iteratively.
E
- Earned Value Management(earned value management, evm)
- A technique to monitor test progress and cost performance by comparing planned vs actual work.
- Effort Variance(effort variance)
- A metric comparing planned hours to actual hours to detect deviations in resource consumption.
- Escalation Path(escalation paths)
- A defined route for escalating issues during outsourced testing.
- Escalation Paths(escalation paths)
- Defined communication channels for reporting issues in a test service contract.
- Expert Judgment(expert judgment)
- A common technique for resource estimation that relies on the experience of experts.
F
- Facilitation Techniques(facilitation technique, timeboxing, round-robin, check-in)
- Methods like timeboxing and round-robin to ensure balanced participation.
- Failure Mode and Effects Analysis (FMEA)(fmea, failure mode and effects analysis)
- A technique adapted to identify potential failure points in test processes and testware.
- Fishbone Diagram(fishbone diagram, ishikawa diagram)
- A visual root cause analysis tool that categorizes potential causes of a problem.
- Fixed-Price Contract(fixed-price)
- A contract where the price is agreed upon upfront regardless of effort.
- Formal Change Control Process(formal change control process)
- A process to evaluate the impact of scope creep on schedule and budget in testing.
- Formal review and acceptance process(formal review and acceptance process)
- A structured process including peer reviews, test result audits, and sign-off procedures for third-party deliverables.
G
- Governance Dashboard(governance dashboard)
- A visual display consolidating test metrics from multiple levels to present a single source of truth for project health.
- Governance Dashboards(governance dashboards, governance dashboard, dashboards)
- Real-time reporting tools that display key performance indicators related to testing progress and quality status.
- Governance Framework(governance framework)
- A structure for decision-making and oversight that test service contracts must align with.
- Governance Mechanism(steering committees, performance dashboards)
- A mechanism such as steering committees or performance dashboards to maintain oversight.
I
- ISTQB Glossary(istqb glossary definitions)
- The official set of definitions for terms used in ISTQB exams.
- Improvement Backlog(improvement backlog)
- A dedicated backlog for retrospective actions, treated with the same priority as other work items.
- Improvement culture(improvement culture, culture of improvement)
- An environment where continuous improvement is valued and consistently practiced.
- Integration of Actions into Workflow(workflow integration)
- The practice of adding retrospective actions to the team's regular backlog and monitoring progress routinely.
- Integration of External Teams(integration of external teams)
- The alignment of an external organization's processes, tools, data, and handover points with the internal test strategy.
- Integration of third-party processes and tools(integrating third-party processes and tools, test process integration)
- Aligning external tools, processes, and reporting formats with an organization's existing test process.
- Interplay of Project and Product Risks(interplay of project and product risks)
- The relationship where a project risk (e.g., schedule delay) may increase a product risk (e.g., insufficient testing).
- Iterative Risk Identification(iterative risk identification)
- The ongoing activity of reassessing risks throughout the project lifecycle, not a one-time event.
J
- Joint kick-off meeting(joint kick-off meetings)
- A meeting held at the start of a project to align both parties on test objectives and acceptance criteria.
K
- Key Performance Indicators(kpis)
- Metrics such as test execution progress, defect density, and risk status tailored to stakeholders.
- Key Performance Indicators (KPIs)(key performance indicators, kpis, kpi)
- Quantifiable measures used to evaluate the success of testing in meeting defined business objectives.
- Key performance indicator(kpi, key performance indicators)
- A measurable value used to evaluate the success of a project or service against objectives.
- Knowledge Transfer Clause
- A contract clause to mitigate disruption from vendor staff turnover.
- Knowledge transfer(knowledge transfer)
- The process of transferring domain knowledge and skills from third-party to internal teams at engagement end.
L
- Level Test Plan(level test plan)
- A document detailing execution for specific test levels, distinct from the master test plan.
- Liaison role(central communication hub, liaison role)
- Central communication hub for coordinating multiple third parties in testing projects.
M
- Managing Stakeholder Expectations(managing stakeholder expectations, stakeholder expectation management)
- The practice of setting realistic expectations through clear communication of test scope, schedule, risks, and dependencies.
- Master Test Plan(master test plan)
- A governance document that links testing to business objectives.
- Milestone Progress(milestone progress)
- A metric displayed on governance dashboards tracking progress toward key project milestones.
O
- Operational vendor management(operational vendor management)
- The management of third-party relationships covering contracts, communication, integration, and quality verification.
- Organizational Resilience(organizational resilience)
- The goal of building the ability to handle crises through continuous improvement.
- Outcome-Based Contract(outcome-based)
- A contract where payment is tied to achieving specified outcomes.
P
- Parametric Model(parametric models, parametric model)
- An estimation technique that uses parameters such as hours per test case to calculate resource needs.
- Pilot phase(pilot phase)
- A trial phase to test integration of third-party processes before full-scale rollout.
- Power-Interest Grid(power-interest grid)
- A tool to categorize stakeholders based on their level of influence and interest for prioritizing engagement.
- Process Improvement Focus(process improvement)
- The emphasis on improving processes and systems rather than assigning blame to individuals.
- Process alignment(aligning processes, process alignment)
- The activity of aligning external organization's processes with internal test strategy through explicit agreement and training.
- Product Risk(product risk)
- A risk related to the quality of the product, such as potential defects or failures in the software.
- Project Risk(project risk)
- A risk related to the management and control of the project, such as resource availability or schedule constraints.
- Project Risk Management(project risk management)
- A continuous activity throughout the project that includes risk assessment and contingency planning.
- Proportionality of mitigation(proportionality, cost-effectiveness)
- The principle that the cost and effort of mitigation should be appropriate to the potential impact of the risk.
Q
- Quality Audit
- A review of vendor's processes and outputs to detect deviations early.
- Quality Verification(quality verification)
- The process of independently checking third-party work against agreed acceptance criteria.
- Quality verification and acceptance(quality verification and acceptance)
- A process to verify third-party deliverables against agreed acceptance criteria through reviews and audits.
- Quality verification mechanism(quality verification, quality verification mechanisms, peer reviews, audits)
- A method such as peer reviews and audits used to maintain consistency in testing outputs.
R
- Resource Allocation(resource allocation)
- The assignment of resources to tasks based on skills, availability, and critical path needs.
- Resource Conflict Resolution(resource conflicts)
- Negotiation with project managers and stakeholders to resolve competing demands for shared resources.
- Resource Estimation(resource estimation)
- The process of defining types and quantities of resources needed based on test plan and risk analysis.
- Resource Leveling(resource leveling)
- A technique to schedule work and allocate people to avoid overloading or underutilizing resources.
- Resource Monitoring(resource monitoring)
- Continuous tracking of actual resource consumption using metrics like planned vs. actual hours.
- Resource Plan(resource plan)
- An output of resource estimation that lists each resource category, its quantity, and the time period it is needed.
- Resource Pool Approach(resource pool approach)
- A shared pool of resources used across multiple projects to improve utilization with careful governance.
- Resource Utilization(resource utilization)
- A metric displayed on governance dashboards showing how test resources are being used.
- Resource Utilization Rate(resource utilization rates)
- A metric measuring the percentage of available resources being used.
- Resource pool(resource pools)
- A collection of computing resources that are dynamically allocated to meet workload demands.
- Retrospective(retrospective, retrospectives)
- A blame-free structured meeting to reflect on a process or iteration and identify improvements.
- Retrospective Action Review Loop(review loop)
- The practice of reviewing previous action items at the start of each retrospective to close the improvement cycle.
- Retrospective Facilitation(facilitation)
- The skill of guiding a retrospective to ensure structured, productive outcomes with actionable improvements.
- Retrospective Follow-up(follow-up)
- The practice of tracking and evaluating action items from retrospectives to ensure continuous improvement.
- Retrospective Format(retrospective formats, start-stop-continue, sailboat metaphor, 4l's)
- A structured approach for conducting a retrospective, such as Start-Stop-Continue.
- Retrospective Maturity Model(retrospective maturity model)
- A framework to assess and evolve the effectiveness of retrospective practices over time.
- Retrospective Outcome Documentation(capturing outcomes)
- The process of capturing specific, measurable, time-bound action items from a retrospective session.
- Retrospectives(retrospectives)
- A systematic method for continuous improvement where teams reflect on past work to identify improvements.
- Risk Analysis(risk analysis)
- An evaluation that identifies higher-risk areas, which require more skilled testers, additional tools, or more time.
- Risk Identification(risk identification)
- The process of finding, recognizing, and describing risks that might affect the achievement of objectives.
- Risk Management in Resource Management(resource risks, contingency plans)
- Proactive identification of resource risks and establishment of contingency plans to prevent shortages.
- Risk Mitigation(risk mitigation)
- The process of identifying, evaluating, selecting, and implementing actions to reduce risk to an acceptable level.
- Risk Mitigation Strategies(risk mitigation strategies)
- Actions tailored to risk type: project management actions for project risks, technical testing actions for product risks.
- Risk Register(risk register)
- A document that records identified risks, response strategies, actions, owners, and timelines.
- Risk Response Strategies(response strategies, mitigation options, risk response strategies)
- Options for addressing a risk: avoid, transfer, mitigate, or accept, each with specific actions.
- Risk Status(risk status)
- A metric displayed on governance dashboards indicating the current risk exposure of the project.
- Risk Workshops(risk workshops)
- Structured facilitation sessions where cross-functional teams collaboratively identify risks using techniques like SWOT analysis or Delphi.
- Risk management process(risk management process steps)
- A sequence of steps including risk identification, analysis, prioritization, mitigation planning, and monitoring.
- Risk-Based Testing (RBT)(risk-based testing, rbt)
- A technique that prioritizes test efforts based on the likelihood and impact of product failures.
- Risk-based Testing(risk-based testing)
- A testing approach that prioritizes test activities based on the risk of failure and impact of defects.
- Root Cause Analysis(root cause analysis, root cause analysis techniques, 5 whys, fishbone diagrams, root cause, root causes, 5 whys root cause analysis, 5 whys technique)
- A systematic technique to identify the fundamental source of a problem or defect.
- Root Cause Analysis in Retrospectives(root cause analysis)
- A technique to identify underlying causes of issues rather than focusing on symptoms during retrospectives.
S
- SWOT Analysis(swot analysis)
- A technique that examines strengths, weaknesses, opportunities, and threats to identify risks in a structured manner.
- Safe Environment for Retrospectives(safe environment)
- Psychological safety established in retrospectives that encourages honest feedback without fear of blame.
- Safe environment(safe environment, safe environment for retrospectives)
- A psychological space where team members feel comfortable giving honest feedback without blame.
- Sailboat Metaphor(sailboat metaphor)
- A retrospective format using a sailboat analogy to discuss wind (enablers) and anchors (obstacles).
- Sailboat Retrospective(sailboat retrospective, sailboat retrospective format, sailboat)
- A retrospective format using a sailboat metaphor to identify what propels the team forward and what holds it back.
- Scope Change Negotiation(negotiating scope changes)
- The negotiation of trade-offs with stakeholders when scope changes impact test schedule or resources.
- Scope Creep(scope creep)
- A risk where project scope expands beyond original contract terms, affecting budgets and timelines.
- Scope Management(test scope management)
- Controlling changes to the agreed test scope through a formal change control process.
- Secondary Risks(secondary risks)
- New risks that arise as a direct result of implementing a risk mitigation action.
- Service Level Agreement (SLA)(sla, service level agreement, slas)
- Measurable quality and timeliness metrics included in a test service contract to verify provider performance.
- Service level agreement(service level agreement, sla, service-level agreements, service-level agreement)
- A contract specifying deliverables, acceptance criteria, timelines, communication protocols, and quality standards.
- Service-Level Agreement in Testing(service-level agreement, sla)
- A contractual document specifying expected service levels, including response times, quality metrics, and escalation paths for testing services.
- Service-level agreements in testing(slas, service-level agreements)
- Contractual agreements specifying communication expectations for testing services.
- Shared Environment Scheduling(shared environment scheduling)
- The proactive coordination of test environment usage across organizations to prevent resource conflicts.
- Single point of contact(spoc, single point of contact (spoc), single point of contact)
- A designated individual within each organization for communication and issue resolution.
- Stakeholder Analysis(identifying and analyzing stakeholders, analyzing stakeholders, stakeholder analysis)
- The process of identifying stakeholders and assessing their influence, interest, and expectations.
- Stakeholder Communication in Testing(test status reporting, communicating test results)
- The reporting of test status, risks, and issues in a way that stakeholders understand their implications for project decisions.
- Stakeholder Identification(identifying stakeholders)
- The process of finding all individuals or groups affected by testing activities.
- Stakeholder Management(effective stakeholder management)
- Ongoing activities to secure resources, gain support, and mitigate conflicts with individuals or groups affected by testing.
- Stakeholder Register(stakeholder register)
- A document that records stakeholder contact information, roles, expectations, and communication preferences.
- Start-Stop-Continue(start-stop-continue, start-stop-continue retrospective)
- A retrospective format where participants identify actions to start, stop, and continue.
- Structured Risk Identification Techniques(structured risk identification techniques)
- Systematic and repeatable methods for identifying risks beyond simple brainstorming, such as checklists and workshops.
- Syllabus learning objective(syllabus learning objectives, learning objectives)
- A specific statement of what a candidate should know or be able to do after study.
T
- Termination Clauses(termination clauses)
- Contract provisions that allow termination under specified conditions such as breach or non-performance.
- Test Activity Dependencies(dependencies between test activities, test activity dependencies)
- The dependencies between test activities and other project tasks that affect scheduling.
- Test Activity Dependency(test activity dependencies)
- A relationship where one test activity must be completed before another can begin, such as waiting for a vendor build.
- Test Cost Management(cost management in testing, test cost management)
- The process of tracking actual expenditure against the test budget and reporting variances.
- Test Environment Scheduling(test environment scheduling)
- The proactive scheduling of shared test environments to avoid resource conflicts.
- Test Governance(governance)
- Oversight mechanisms ensuring testing meets business objectives, including governance checkpoints and reporting.
- Test Management as a Sub-Project(test manager's role in planning, scheduling, and controlling testing)
- The practice of planning, scheduling, and controlling testing activities as a separate sub-project within the overall project.
- Test Manager Mediator Role(mediator role)
- The role of the test manager in resolving conflicts by focusing on contract terms and project goals.
- Test Manager Project Management Role(test manager's project management role)
- The responsibility of the test manager to plan, schedule, and control testing activities as a sub-project.
- Test Manager Responsibility for Stakeholder Understanding(test manager responsible for ensuring stakeholders understand test results)
- The test manager's duty to ensure stakeholders comprehend test results and their implications for project decisions.
- Test Plan Alignment(test plan alignment with project schedule, test plan alignment, test plan alignment with project plan)
- The integration of the test plan into the project plan and synchronization of test milestones.
- Test Process Model(test process model, v-model, agile)
- A model such as V-model or agile that defines how an external test provider integrates with internal teams.
- Test Project(testing sub-project)
- The testing sub-project that the test manager oversees within the broader project context.
- Test Resource Management(resource management in testing)
- The management of people, tools, and environments needed for testing activities.
- Test Scope Management(scope management in testing)
- The process of controlling changes to test scope and managing stakeholder expectations.
- Test Service Contract(contract, test service contract)
- A legally binding agreement defining scope, deliverables, SLAs, and governance for outsourced testing services.
- Test Stakeholder Communication(stakeholder communication in testing, stakeholder communication)
- The communication of test status, risks, and issues to project stakeholders.
- Test environment integration(integration of test environments, test environment integration)
- The alignment of external organizations' test environments, tools, and data with internal test strategy.
- Third-Party Relationship Management in Testing(third-party relationship management)
- The management of contracts, SLAs, and quality verification for external vendors or service providers involved in testing.
- Third-party relationship management(third-party relationship management)
- Management of relationships with external organizations that provide testing services or products.
- Time-and-Materials Contract(time-and-materials)
- A contract where payment is based on actual time and materials used.
- Timeline-based Retrospective(timeline-based retrospective, timeline)
- A retrospective format that arranges events chronologically to identify patterns and insights.
- Traceability of Retrospective Outcomes(traceability)
- Documentation that supports linking retrospective actions to improvement goals for later review.
- Traffic-light Indicators(traffic-light indicators)
- Color-coded statuses (red/amber/green) used on dashboards to highlight deviations from the plan.
U
- Utilization Rate(utilization rate, utilization rates)
- A metric that tracks the percentage of time testers spend on testing versus other tasks.